Moreover, we arrange on-site assembly and installation of all  kinds of   heavy   equipment.  Our  service  includes survey, development of cargo handling project, movement of equipment using mobile cranes and hydraulic lifting systems, preliminary  and  final  assembly and leveling.

TRANSPORT   SYSTEMS experience includes installation of 350-ton gas turbine  and  288-ton  generator onto 6.2 m high basement in Sredneuralsk, Russia.
The  work   was   carried  out  in  difficult  weather  conditions at temperatures below -30 C.

     